Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri May 3 02:48:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    9 Blog Entries  next>>
2 Followers
Info Update
85707 views
24

★★★
Jan 02 2016 (12:01)   12229/Lucknow Mail (PT) | MB/Moradabad Junction (7 PFs) | GZB/WAP-5/30011
 
Twesh~
Twesh~   6189 blog posts
Entry# 1699021            Tags   Past Edits
GOOD NEWS ON #gzbmbelectrification Successful trials held by Moradabad Divison on 31st December using GZB WAP5 30011 aka NAVODIT...5 pair of trains are planned to be run with electric locos...
1. Lucknow Mail
2.Lucknow AC.
3. LJN MTC Rajya Rani
4.
...
more...
Shramjeevi
5. Anvt BSb Garib rath.
CRS expected on secnd week of January..Chief Electrical Engineer N.R. to inspct the ongoings on this Saturday..demand fr electric locos hve been sent to RB for inaugural runs nd permanent use...total 11 pairs of trains are planned to be run with electric loco after approval frm RB incl. 5 passenger trains...
#moderator #admin sir kindly mark MB GZB sectn as BG double electrified...

Translate to English
Translate to Hindi

5 Public Posts - Sat Jan 02, 2016

2 Public Posts - Sun Jan 03, 2016

3 Public Posts - Sun Jan 10, 2016
1 Followers
Info Update
123782 views
19

★★★
Oct 22 2015 (15:31)   MB/Moradabad Junction (7 PFs)
 
Twesh~
Twesh~   6189 blog posts
Entry# 1625119            Tags   Past Edits
A BIG UPDATE ON MB-GZB ELECTRIFICATION said by DRM MORADABAD through my Twitter query:--
DRM Moradabad @drm_moradabad:----
@tweshrajput Sir, we should have trains with electric traction in December itself after getting CRS clearance .
click here
...
more...

Translate to English
Translate to Hindi

10 Public Posts - Thu Oct 22, 2015

7 Public Posts - Fri Oct 23, 2015

2 Public Posts - Sat Oct 24, 2015

1 Public Posts - Sun Oct 25, 2015
1 Followers
Info Update
34094 views
13

★★
Sep 27 2015 (00:43)   MB/Moradabad Junction (7 PFs)
 
Twesh~
Twesh~   6189 blog posts
Entry# 1600986            Tags   Past Edits
So after giving so many dead lines for electrification completion dey term it "completed and energised" UMB Division sets the CRS Inspection for GZB-MB route in 2015-16 session incl. GZB-MTC, JAT-UHP-Katra, MTC-SRE....
Update on much awaited Moradabad-New Delhi electrification #gzbmbelectrification..
AND THE COUNTDOWN BEGINS..dont think IR taking this lightly now....
click here
...
more...

Translate to English
Translate to Hindi

4 Public Posts - Sun Sep 27, 2015

1 Public Posts - Mon Sep 28, 2015

5 Public Posts - Mon Oct 05, 2015

2 Public Posts - Tue Oct 06, 2015

2 Public Posts - Thu Oct 08, 2015

1 Public Posts - Thu Nov 12, 2015

1 Public Posts - Fri Nov 13, 2015
1 Followers
Info Update
29744 views
17

★★
Apr 10 2014 (14:34)   GMS/Garhmuktesar (3 PFs)
 
railfan.z^~
railfan.z^~   13777 blog posts
Entry# 1052356            Tags   Past Edits
CONSTRUCTION WORK OF THE NEW GARHMUKTESHWAR BRIDGE.
.
Pic 1 (Left to right) The new bridge for the UP line constructed while doubling ; the new bridge for the DOWN line whose construction started while doubling and is now heading completion ; the old Garhmukteshwar bridge that initially used to serve both the lines and presently caters to the DOWN traffic.
.
Pic
...
more...
2: The track is all laid and completed and just needs to be joined to the main line post which the old bridge will cease to serve the traffic. Once this is done, trains will no longer have to slow down for the 20kmph PSR that exists on the old bridge (Pic 3). Travel time is expected to be cut short slightly and only AFTER all this is done, will this section be electrified under #GZBMBElectrification .

Translate to English
Translate to Hindi

5 Public Posts - Fri Apr 11, 2014

18774 views
0

Apr 12 2014 (12:41)
Twesh~
Twesh~   6189 blog posts
Re# 1052356-15              
Travel time is expected to be cut short slightly and only AFTER all this is done, will this section be electrified under #GZBMBElectrification .
Translate to English
Translate to Hindi

1 Public Posts - Sat Apr 12, 2014

1 Public Posts - Fri May 09, 2014
Info Update
23302 views
22

★★★
Apr 08 2014 (20:23)   04403XX/Barauni - New Delhi Special | PKW/Pilkhua (3 PFs)
 
railfan.z^~
railfan.z^~   13777 blog posts
Entry# 1050487            Tags  
Another cute OHE van spotting!
Traces of work on #GZBMBElectrification all around!
For SB.
Translate to English
Translate to Hindi

1 Public Posts - Wed Apr 09, 2014
Page#    9 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 369HBR~
4466128 ★★★ 106AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy