line (towards left) is up line i.e., on Hosapete road (NH) side. 2nd line (towards right) is down line i.e., on RYMEC side
тП║я╕ПExcavation (which was done earlier) for OHE pole at 203.2 km is filled back - picture 2
тП║я╕ПConcreting under progress - picture 17
тП║я╕ПFoundations (14 Nos.) & pits (6 Nos.) for OHE poles were spotted adjacent up line on Hosapete road (NH) side from 203.3 km to 204.3 km between Ballari Cantonment and Ballari Cantonment Halt - pictures 3 to 22
Pictures source: Self