Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun May 5 07:38:31 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by ssastronaut
Page#    534 Blog Entries  <<prev  next>>
General Travel
26252 views
12

★★
Jan 09 (12:39)   20706/Mumbai CSMT - Jalna Vande Bharat Express
Dgvj01~
Dgvj01~   2614 blog posts
Entry# 5936540            Tags  
3 compliments
Agree Agree:but every1 will have lips sealed. Agree:I agree. aftr Feb24 speed increase
For the sake of improvement ..
People traveling in this train should file daily complaints and question authorities about the premium they are charging in the name of VB.

This train is slower than atleast 15 other normal mail express services on the same route between CSTM-NK.
...
more...

meanwhile , Rajdhani and Shirdi VB takes around 2 hours 40 mins to cover CST Nashik distance .. this train is officially taking around 3 hours and 18 mins .. with a lot of normal mail ex trains scheduled to cover the same distance in lesser time..

why pay premium ? for below average service ??
IR and Railway board should be made answerable ... Rail yatris and organizations should raise this question ...

Translate to English
Translate to Hindi

1 Public Posts - Wed Jan 10, 2024

5109 views
1

Jan 10 (09:32)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5936540-2              
Agree.. however after Feb 24 track is being upgraded to 130 kmph operation. So slack time is likely to get reduced on entire route
Translate to English
Translate to Hindi

3 Public Posts - Wed Jan 10, 2024

5697 views
1

Jan 11 (20:35)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5936540-6              
Igatpuri MMR already approved and operating on 130kmph. MMR-AWB-J track upgradation is under progress.
Translate to English
Translate to Hindi

10 Public Posts - Fri Jan 12, 2024

8517 views
2

Jan 13 (07:51)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5936540-17              
This VB is mainly catering Aurangabad/Sambhajinagar and Nashik. 70-80% paxs from/for Aurangabad
Translate to English
Translate to Hindi

8119 views
0

Jan 13 (07:51)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5936540-18              
no..this VB should be there.
Translate to English
Translate to Hindi

8402 views
0

Jan 13 (07:52)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5936540-19              
Right now MMR-AWB- J speed limit is 95-100 kmph. VB is running at 100
Translate to English
Translate to Hindi
General Travel
20110 views
4

Jan 08 (14:16)   20706/Mumbai CSMT - Jalna Vande Bharat Express | CSMT/Mumbai CSM Terminus (18 PFs)
deepak.yerr~
deepak.yerr~   6109 blog posts
Entry# 5935636            Tags  
1 compliments
Useful
CSTM Jalna VB today occupancy at 1230
176 vacant seats
From Nashik 199 so 23+ have deboarded
From Aurangabad 410 seats available means they are only 60 travellers to Jalna 15% of train capacity.
...
more...

Being Monday occupancy will be less wil have better occupancy from Thrusday to Saturday.

Jan Shatabdi leaves at 1210 and VB follows at 1310. and running time difference is just 15 mins.
The dep should be delayed to 1540 and speedup by 45 mins.

Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 08, 2024

1 Public Posts - Tue Jan 09, 2024

9024 views
0

Jan 10 (09:36)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5935636-3              
Yes, that is what railway activists are demanding from day 1. Departure from CSTM should be after 1500 hRs and can easily be speeded up by 1 hr
Translate to English
Translate to Hindi
General Travel
54750 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   291 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

6 Public Posts - Sat Nov 25, 2023

3 Public Posts - Sun Nov 26, 2023

27365 views
1

Nov 26 2023 (10:37)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5893062-10              
SCR should have more accurate.
25. Tenders allocation is in process for Aurangabad-Ankai doubling work.
# Final Location Survey is going for Aurangabad-Parbhani doubling.
Translate to English
Translate to Hindi

1 Public Posts - Sun Nov 26, 2023
Info Update
44607 views
2

Oct 27 2023 (08:48)   17057/Devagiri Express (PT) | SC/Secunderabad Junction (10 PFs)
hrid22~
hrid22~   12678 blog posts
Entry# 5863466            Tags  
17057 Devagiri Exp Only 2 to 3 Sleeper And Lhb Coach Belongs To Scr Zone Rest Sleeper And Ac 3 Tier Coach Is Of Cr Zone
Translate to English
Translate to Hindi

2 Public Posts - Fri Oct 27, 2023

36539 views
1

Oct 28 2023 (05:48)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5863466-3              
suggest this on twitter
Translate to English
Translate to Hindi
1 Followers
General Travel
98801 views
9

Oct 15 2023 (14:33)   12785/Kacheguda - Mysuru SF Express (PT)
tr3v0r2341
tr3v0r2341   1 blog posts
Entry# 5853346            Tags   Past Edits
Trains 12785, 2786 are still having the old coaches instead of LHB despite being the one of the most demanded and crowded trains in SCR and SWR.

And based on the posts which I have read regarding this transfer of coaches, the recent change from running this train using diesel locomotive to electric WAP7 locomotive will give a strong weightage to make the decision on changing the coaches to LHB.
...
more...

The current coaches, including the Air conditioned ones are not at all well maintained and it has become a nightmare for the passengers to travel n such a demanding train.

Requesting to transfer the coaches to LHB for trains 12785 and 12786 ASAP for smoother and comforatble commute between Hyderabad (Kacheguda) to Mysore

Translate to English
Translate to Hindi

69 Public Posts - Sun Oct 15, 2023

14 Public Posts - Mon Oct 16, 2023

1 Public Posts - Tue Oct 17, 2023

5060 views
2

Oct 17 2023 (07:21)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5853346-101              
2 compliments
Useful Useful
Nagarsol is not A1 station. It is NSG3/4 station with 98% inbound and out bound Shirdi travellers. Nagarsol is not even a town, it is a village. NED and AWB are the most revenue generating stations in NED division.
Translate to English
Translate to Hindi

17 Public Posts - Tue Oct 17, 2023
Page#    534 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1870067 ★★★ 223GondwanaExpress^~
3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy