12381 deluxe humiliated by 3 LHB High Speed trains back to back at Danwar
Arrival at Danwar 05:57
Departure Danwar 06:15
halt 18m
First to overtake was 12393 Kranti (why did NCR allowed this OT...
more... when both are 130 and non stop till NDLS as OT happened after ALJN ? ;) ;) )
Followed by Kranti it was ECR King 12309 Patna Rajdhani the surprising overtake was by 12559 Shivganga Express (faced overtake by 12393 and 12309 made 12381 repent for it, this was also not required considering the non stop run of 130 mps poorva and 110 mps shivganga express).
Karma hits Kranti 12393,looped at Wair, 12309 Patna Rajdhani zoomed past it at 130kph and 12381 departed just 2m after 12559 shivganga express.