Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Apr 28 05:36:15 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 935176
Posted: Dec 15 2013 (10:19)

14 Responses
Last Response: Dec 15 2013 (17:38)
1 Followers
General Travel
2851 views
12

★★
Dec 15 2013 (10:19)  
 
Truth finder~
Truth finder~   13814 blog posts
Entry# 935176              
SCR announced completion of electrification works between Renigunta-Guntakal (310km), Lingapalli-WADI.
Here are the routes now electrical.
Translate to English
Translate to Hindi

528 views
4

Dec 15 2013 (10:25)
Truth finder~   13814 blog posts
Re# 935176-1              
Here are the salient features of it.
SCR completed Electrification of two major sections of Renigunta – Guntakal and Lingampalli - Wadi on Mumbai route; And prepares for the running of express/passenger trains on Electric traction in these routes shortly.
South Central Railway has completed the electrification works on 2 major sections situated on Mumbai route. These are – 310 kms long Renigunta to Guntakal section on Chennai – Mumbai route; and 161 kms long Lingampalli to Wadi section on Secunderabad - Mumbai route. The energization of the last legs in these sections
...
more...
this week marks a giant step forward in the progressive electrification of all major routes on SCR.
Renigunta – Guntakal Section:
The Electrification of this key route was sanctioned in FY 2004-05. Works started from Renigunta and the track between Renigunta and Muddanur (180 kms) was gradually electrified in various phases during the period 2008-12. Subsequently, works have been taken up in the remaining stretch from Muddanur to Guntakal (130 kms). The last leg on this route, a 30 kms long Gooty – Guntakal section, has been charged on 5th December, 2013, enabling running of goods trains on electric traction seamlessly from Chennai/Krishnapatnam ports to Guntakal. At present, 50 goods trains are being run on an average per day in this section. Complete electrification on this section will give boost to the freight traffic, especially to the movement of the commodities - coal, iron ore and cement via this route.
While the works on Renigunta to Nandaluru section (87 kms) were executed by Railway Electrification unit Chennai, the works from Nandaluru to Guntakal (223 kms) were taken up by M/s.Rail Vikas Nigam Limited (RVNL). Express/passenger trains will also be run directly up to Guntakal on this route after getting clearance from the Commissioner of Railway Safety, who is likely to inspect the Muddanur – Guntakal section in January, 2014. The total expenditure on this challenging electrification project, spread over 310 route kms (736 track kms) is around ` 392 crs.
Several infrastructural units like - 22 switching stations; 5 maintenance depots and 5 Traction substations form part of this project.
Lingampalli – Wadi section:
This electrification project over 161 route kms (411 track kms) was sanctioned in FY 2006-07. The works commenced from Lingampalli and progressed in a phased manner towards Wadi. The electrification works on Lingampalli – Vikarabad section (50 kms) and Vikarabad – Tandur section ( 41 kms) have gradually been completed in phases during the period from January, 2010 to March, 2011. The electrification of the remaining stretch from Tandur to Wadi (70 kms) has also been completed recently. The goods lines in the Wadi yard have been energized on 11th December, 2013, which will facilitate running of goods trains on electric traction continuously from Secunderabad to Wadi. Currently, around 25 goods trains are being operated per day in this route. Provision of electric traction on the entire route offers immense scope for improvement of freight traffic, mainly of the movement of commodities – coal, cement and clinker in this sector.
The electrification of passenger lines at Wadi station is likely to be completed in January, 2014. Express/passenger trains will be run with electric engines in Secunderabad – Wadi section after clearance from CRS, which is likely to be in March, 2014. This prestigious project has been executed by the Railway Electrification unit, Secunderabad, at a cost of around ` 204 crs.
Benefits:
At present, South Central Railway has got 41% of its route kms electrified i.e. 2375 route kms, out of a total of 5810 route kms. In addition, electrification works on another major section from Guntakal to Wadi are under active progress and works on Guntur to Guntakal route will also be taken up shortly.
Running the trains on electric traction yields several operational and economic benefits. An extended network of electrified Railway lines will enable seamless running of trains over long distances without any need for loco change from electric to diesel and vice-versa.It reduces the travel time benefiting the passengers and freight customers. Due to lesser detentions, average speed of the goods trains and passenger trains increases, which in turn improves availability of crew. Electric traction offers pollution-free transportation and considerable fuel economy, which is socio-economically beneficial.
Shri P.K.Srivastava, General Manager/SCR complemented the team of SCR’s officers for the commendable achievement of electrifying the two major sections as mentioned above. The GM advised the officials to speed up the progress of electrification on other sanctioned routes also so as to derive the optimal operational benefit.

Translate to English
Translate to Hindi

13 Public Posts - Sun Dec 15, 2013

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4402199 ★★★ 259AvishekRay~
4465985 ★★★ 128AvishekRay~
1910443 ★★★ 141Praveen~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy