I think the 15108 slip route gkp-kop should be detached from kashi exp at kalyan jn instead of bhusaval and attach to sahyadri exp from kalyan jn. This will reduce the wait time of 420 mins at bhusaval for maharashtra exp and will also reach kolhapur early by 7hrs.