Titagarh Rail Systems unveils innovative train design for Ahmedabad Metro Phase 2 projectTitagarh Rail Systems has unveiled the design of new train sets for Ahmedabad Metro Phase 2, featuring 10 three-coach trains inspired by local festivals like Uttarayan and Garba. These trains will be driverless, using Grade GoA4 automation for increased efficiency and safety. The trains, part of a ₹350 crore contract awarded...
more... to Titagarh in August 2023, will be deployed on the 39.22 km Red Line alongside existing Hyundai Rotem trains. They will be manufactured domestically in Titagarh's Uttarpara facility, near Kolkata, and stored at the Gyaspur Depot until the new Indroda Depot in Gandhinagar is completed. Titagarh has previously worked on Pune and Surat Metro projects, and is also assembling 204 coaches for Bangalore Metro. The new trains are a significant step toward enhancing Ahmedabad's public transport network, promoting local culture, advanced technology, and domestic manufacturing.
Ahmedabad Metro Phase 2 ke liye Titagarh Rail Systems ne naye train sets ka design reveal kiya hai. Isme 10 train sets hain, har ek mein 3 coaches hain. Train ka design Ahmedabad ke festivals, jaise Uttarayan aur Garba se inspired hai. Ye driverless trains honge, aur Grade GoA4 automation...
more... ke saath chalta hai, jisse efficiency aur safety badhega. Is project ke liye Titagarh ko August 2023 mein ₹350 crore ka contract mila tha. Ye trains 39.22 km ki Red Line par chalenge, jahan pe already Hyundai Rotem ki trains chalti hain. Train ka manufacturing Titagarh ke Uttarpara facility mein hoga, Kolkata ke paas, aur Gyaspur Depot mein store kiya jaayega jab tak Indroda Depot, Gandhinagar mein banne nahi lagta. Titagarh pehle bhi Pune aur Surat Metro projects mein kaam kar chuka hai, aur Bangalore Metro ke liye 204 coaches assemble kar raha hai. Naye trains se Ahmedabad ki public transport bahut badhegi, aur local culture, advanced technology, aur domestic manufacturing ko promote karega.