Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Oct 10 03:49:41 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6214439
Posted: Yesterday (19:57)

No Responses Yet
Rail News
785 views
0

Metro
BMRC/Bangalore Metro
Yesterday (19:57)   Delhi-Faridabad Metro Line Inaugurated, Bangalore Metro's Yellow Line Delayed

Exynos9611~   21223 news posts
Entry# 6214439         Tags   Past Edits
Bangalore Metro Yellow Line To Start Operations In January 2025

Prime Minister Narendra Modi inaugurated the Delhi-Faridabad Metro Line extension, connecting Badarpur to Escorts Mujesar in Faridabad. This 9-station corridor, costing nearly Rs. 2,500 crore, was built largely with Indian resources and aims to provide hassle-free travel for 2 lakh commuters daily. The Haryana government contributed the majority of the funding,...
more...
with the Centre and Delhi Metro also contributing. The line runs along the Delhi-Mathura Road (NH-2). The Haryana Chief Minister thanked the Prime Minister for the new service, emphasizing its role in connecting Faridabad with other NCR towns. He also announced that the Prime Minister would be approving a new Metro line connecting Gurgaon to Faridabad. Separately, the Bangalore Metro Rail Corporation Limited (BMRCL) announced a delay in the commencement of operations on the Phase 2 Yellow Line. The line, spanning 19.143 km and connecting RV Road to Bommasandra, is expected to be operational by January 2025, with the full fleet of trains to be operational by August 2025. The initial delay is due to the availability of only 3 out of 15 train sets, which are being provided by China Railway Construction Corporation (CRCC). The contract for the rolling stock was initially awarded to CRCC, but later cancelled and awarded to Titagarh Rail System Limited. Titagarh will deliver 2 trains per month and is expected to complete the delivery of 15 trains by August 2025.

Prime Minister Narendra Modi ne Delhi-Faridabad Metro Line ka extension inaugurate kiya, jo Badarpur se Faridabad mein Escorts Mujesar tak connect karta hai. Yeh 9 station wala corridor, almost Rs. 2,500 crore ka, mostly Indian resources se banaya gaya hai aur iska aim 2 lakh daily commuters ke liye hassle-free travel...
more...
provide karna hai. Haryana government ne funding mein bahut zyada contribute kiya, Centre aur Delhi Metro ne bhi contribute kiya. Line Delhi-Mathura Road (NH-2) ke saath chalti hai. Haryana Chief Minister ne Prime Minister ka thanks bola is new service ke liye, aur usne iski role ko highlight kiya Faridabad ko other NCR towns se connect karne mein. Unhone yeh bhi announce kiya ki Prime Minister Gurgaon ko Faridabad se connect karne wali ek new Metro line approve karenge. Alag se, Bangalore Metro Rail Corporation Limited (BMRCL) ne Phase 2 Yellow Line par operations start hone mein delay ki announce ki hai. Yeh line, 19.143 km tak faili hai aur RV Road se Bommasandra tak connect karti hai, January 2025 se operational hone wali hai, aur full fleet of trains August 2025 tak operational hone wali hai. Initial delay ke peeche 15 train sets mein se sirf 3 train sets available hone ki wajah hai, jo China Railway Construction Corporation (CRCC) provide kar rahi hai. Rolling stock ka contract pehle CRCC ko award kiya gaya tha, par baad mein cancel karke Titagarh Rail System Limited ko award kiya gaya. Titagarh har mahine 2 trains deliver karega aur August 2025 tak 15 trains ki delivery complete karne ki ummid hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3270606 ★★★ 399TravelBahanaYou^~
5248097 ★★★ 92Jordan~
1959644 ★★★ 272Arpit~
5335816  13purubaba.ankit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy