VB sleeper between CSMT and MAS with run time of 14 hours, CSMT and SBC with run time of 12 hours and CSMT and SC with run time of 9 hours is needed. Daily up /down trains will clear all the passenger requirements. Udyan express needs to get Faster and converted as SF express and intermediate stops to be curtailed a run time of 18 hours is practically feasible. The number of stops can be reduced to around 20 and make the express train into SuperFast and this will clearly cater to the long distance travellers. SWR can introduce new trains from SBC to Kalaburagi or Raichur to cater to passengers travelling to Kalyana Karnataka region. There is no more excuses for not speeding up this long distance trains including LTT - Coimbatore trains into real Super Fast category with average speeds of 65 kmph.