Blog Entry# 6182450
Posted: Sep 08 (08:37)
15 Responses
Last Response: Sep 08 (18:41)
Now Bhopal-Lucknow GR has become LHB with more than required number of coaches, then NER must try to increase the frequency of Both LJN-BPL and LJN-R GR by arranging extra rake. Also BPL-LJN GR can now be diverted via GWL BIX ETW to provide 1st ever connection of Bhopal to Bhind Etawah, timings should be adjusted like below
BPL-LJN : /train/233805/12/906
...
more...