Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Oct 1 14:50:18 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6148500
Posted: Aug 06 (19:55)

No Responses Yet
Rail News
1601 views
0

Metro
HM/Hyderabad Metro
Aug 06 (19:55)   Hyderabad Metro Phase II: Expansion Plans, Cost Estimates, and Challenges

Exynos9611~   20378 news posts
Entry# 6148500         Tags   Past Edits
Hyderabad Metro Phase II | హైదరాబాద్ మెట్రో రెండో దశ కోసం కారిడార్ల వారీగా డీపీఆర్‌లు సిద్ధం

Hyderabad Metro's Phase II project, aiming to expand the existing network by 78.4 km across 5 corridors, is in the planning stages. The project, estimated to cost ₹24,042 crore, will connect the existing Phase I network. Consultants are finalizing the Detailed Project Reports (DPRs) for the 5 corridors, with a separate...
more...
DPR for the Old City extension to Chandrayanagutta. The construction is expected to be awarded to separate companies for each corridor, allowing simultaneous execution. Funding for the project will be shared equally by the central and state governments, with additional funds secured through loans and a public-private partnership (PPP) model. The project is expected to be completed by 2029. The longest corridor, connecting Nagole to Shamshabad Airport, is estimated to cost ₹8,500 crore, with GMR Airport contributing to its construction. The Old City section faces significant challenges, including the acquisition of a large number of properties along a narrow road, which could account for half the project's cost. The proposed route includes over 1100 properties, requiring extensive land acquisition and compensation, estimated to cost around ₹2,300 crore.

Hyderabad Metro ka Phase II project, jo existing network ko 5 corridors mein 78.4 km tak expand karega, planning stage mein hai. Project, ₹24,042 crore ka estimate ke saath, existing Phase I network ko connect karega. Consultants 5 corridors ke liye Detailed Project Reports (DPRs) finalise kar rahe hain, aur Old...
more...
City extension ko Chandrayanagutta tak le jaane ke liye alag se DPR banaya ja raha hai. Har corridor ke liye alag-alag companies ko construction award karne ka plan hai, jisse saare corridors ek saath ban sake. Project ka funding central aur state governments dono se aayega, aur baaki funding loan aur public-private partnership (PPP) model se aayega. Project 2029 tak complete hone ki ummeed hai. Sabse lamba corridor, jo Nagole se Shamshabad Airport tak jaata hai, ka estimated cost ₹8,500 crore hai, aur ismein GMR Airport bhi partner hai. Old City section mein bahut saare challenges hain, jaise ki narrow road mein bahut saari properties ko acquire karna, jiske wajah se project ka half cost aane ki ummeed hai. Proposed route mein 1100 se zyada properties hain, aur unki land acquisition aur compensation ke liye ₹2,300 crore ka cost aane ki ummeed hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5650504 ★★★ 110jishnuthakur12301^...
4312546 ★★★ 284jishnuthakur12301^...
4214312 ★★★ 48rizwanmahai~
5383447 ★★★ 145jishnuthakur12301^...
3247625 ★★★ 134~
2308508 ★★★ 38Yantravinyas
3368675 ★★★ 397mr.train_wala~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy