Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Aug 5 20:42:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6140061
Posted: Jul 30 (04:09)

8 Responses
Last Response: Jul 31 (22:56)
General Travel
24891 views
1

Jul 30 (04:09)   06001/Ernakulam Jn. - Bengaluru Cantt. Special Fare Vande Bharat Special
Railfan_SRDiv^~
Railfan_SRDiv^~   2591 blog posts
Entry# 6140061            Tags   Past Edits
Very slow speed from TCR to PGT and PGT to CBE. TCR to PGT can be done in 1 hour and so PGT to CBE in 1 hour. Moving via A line could also save some time in PGT to CBE section.

Not sure if it do up and down in same day with single rake considering speed restriction in the area in case if made daily
...
more...

One way to do it is if CBE BNC VB starts at 06:30 AM and arrive BNC at 12:55 PM , the same train can leave to ERS via JTJ bypass at 13:45 PM and arrive ERS at 22:15 PM.

The train leaving ERS at 06:30 AM can arrive BNC at 15:05 PM and can leave as CBE VB at 16:30 PM and arrive CBE at 22:55 PM

With PM at CBE

Best option is to make CBE VB via JTJ bypass with stop at tiruppur and Uday via Hosur Dharmapuri after testing, That would be a faster speed for VB and save lot of time.

Translate to English
Translate to Hindi

3 Posts

14744 views
0

Jul 30 (23:26)
RFIR~
RFIR~   6943 blog posts
Re# 6140061-4              
No maintenance facility at KJM and neither tracks available for parking trains so there is no chance of starting any service. It just takes 20 min from KJM till BNC. The 1 hr shown in TT is slack time. It will never reach KJM at 21 hrs so has enough time to cover delay. SWR has same strategy for all trains. Just have a look at the TT of Island exp between KJM and SBC.
Translate to English
Translate to Hindi

13297 views
0

Jul 31 (02:10)
Railfan_SRDiv^~
Railfan_SRDiv^~   2591 blog posts
Re# 6140061-5              
Right thats why I put a RSA pattern in the post so it helps. Its gonna be tough to make up and down in single day with the speed restriction. A slight delay would affect the return train badly or they should operate with two rakes like ICE
Translate to English
Translate to Hindi

13315 views
0

Jul 31 (02:14)
Railfan_SRDiv^~
Railfan_SRDiv^~   2591 blog posts
Re# 6140061-6               Past Edits
Yea I did not think of that. All it need is to have a loop PF and some cleaning crew and water filling cause maintanence will be at ERS.

But I would say my post above might help if RSA is approved. Infact if CBE BNC VB is started at 06:30 AM it can arrive BNC (route change via JTJ bypass with Tirupattur stop) 12:30 PM and return to ERS VB can start at 13:30 PM can arrive ERS at 22:00 PM and return can start at 07:00 AM can arrive
...
more...
BNC at 15:45 and CBE VB can leave at 16:55 PM and can arrive CBE at 22:35 PM with PM at CBE or ERS. It might help

And Uday should run via Hosur, Dharmapuri

Translate to English
Translate to Hindi

7643 views
0

Jul 31 (09:37)
RFIR~
RFIR~   6943 blog posts
Re# 6140061-7              
Ideally the RSA with CBE VB is a good option. Had the CBE VB run via JTJ it could have still been a good option. Given that Dharmapuri and Hosur are the additional two stations in the route connected with VB, highly unlikely of removing those. It should have been done from beginning itself
Translate to English
Translate to Hindi

5035 views
0

Jul 31 (22:56)
Railfan_SRDiv^~
Railfan_SRDiv^~   2591 blog posts
Re# 6140061-8              
Thats why i mentioned, Tirupattur, Bangaret should be given for VB whereas Dharmapuri and Hosur for Uday
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1993978 ★★★ 90^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy