Mumbai: Roof collapse at CSMT, rail fracture, erratic services seen on CROn July 13, 2024, Mumbai's Central Railway experienced significant disruptions due to heavy rain and wind. A rail fracture near Matunga caused delays, and later, a portion of the roof between platforms 6 and 7 at Mumbai CSMT collapsed. Fortunately, no one was injured. The incident led to a 40-minute disruption...
more... on the Kalyan-bound slow line between 1 pm and 1.40 pm. Trains were diverted, resulting in delays for both up and down services. Western Railway services operated with minor delays. Railway officials inspected the affected area and are taking steps to prevent future incidents.
13 July, 2024 ko Mumbai ka Central Railway, heavy rain aur wind ki wajah se bahut disturb raha. Matunga ke paas track fracture hone ki wajah se delay hua aur uske baad, Mumbai CSMT station ke platform 6 aur 7 ke beech roof ka ek hissa gir gaya. Thank God,...
more... kisi ko bhi injury nahi hui. Is incident ki wajah se Kalyan-bound slow line 1 pm se 1.40 pm tak 40 minutes ke liye band rahi. Trains divert ki gayi, jisse up aur down services mein delay hua. Western Railway services thoda delay ke saath chal rahe the. Railway officials ne affected area ki inspection ki aur future mein aisa na ho iske liye steps le rahe hai.