@ADI: Ahmedabad Jn|/departures/60|/departures/60|/departures/60 3km/h 21m early
@ADI: Ahmedabad Jn|/departures/60|/departures/60|/departures/60 &4 km/h On pf# 9 . All set to depart, the loco being KJM WAP-7 . Second pic of Ahmedabad Station board and nearby HSR station construction
please wait...Translate to English@ADI is ready to roll out at Ahmedabad Junction, going at a cool 3km/h and running 21 minutes ahead of schedule. The train's at platform 9, revving up at 4 km/h with KJM WAP-7 loco in charge. Check out the station board and construction at the nearby HSR station.