Indore Khandwa Rail Line: इंदौर खंडवा ब्राडगेज पर आकार लेने लगा 900 मीटर लंबा रेलवे ब्रिजThe final section of the Ratlam-Fatehabad-Indore-Mhow-Khandwa broad gauge project, the Mhow-Sanawad meter gauge line, is being converted to broad gauge. A new broad gauge line is being laid between Mhow and Sanawad, including a 900-meter long bridge over the Narmada River at Mortakka. The old bridge has been demolished and...
more... a new one is being constructed with 16 pillars up to 35 meters high. The bridge is expected to be completed by December 2024. The Sanawad-Barwah rail line will also be converted to broad gauge by then, allowing for broad gauge train operations between Barwah and Khandwa.
Ratlam-Fatehabad-Indore-Mhow-Khandwa broad gauge project ka aakhri section, Mhow-Sanawad meter gauge line, ko broad gauge mein convert kiya ja raha hai. Mhow aur Sanawad ke beech ek new broad gauge line layi ja rahi hai, jismein Mortakka mein Narmada River pe 900 meter lamba bridge bhi banaaya ja raha hai. Purana bridge...
more... demolish kar diya gaya hai aur ek new bridge 16 pillars ke saath banaaya ja raha hai, jinki maximum height 35 meter tak hogi. Bridge December 2024 tak complete hone ki ummeed hai. Tab tak Sanawad-Barwah rail line bhi broad gauge ho jaayega, jisse Barwah se Khandwa tak broad gauge line pe train chalna shuru ho jaayega.