Hi, I have a Question. 11006 is taking 25 mins to cover PDY to VM, where as 11005 is taking 1hr 25m for the same stretch. I could not understand this. Why is this difference? When checked for other train timings passer train with 3 halts is covering this stretch at 45 mins. I also feel 25mins is also not practical and 1hr 25min is too much. May someone clarify why TT timings are given like this. In fact in the reverse direction VM-PDY none of the SF cover this distance faster than passenger train. Is it to allow some buffer in TT?