5 Years Ago Bsl Bd Wr 3rd Line Final Location Work Was Sanctioned But I Guess Bsl Division Will Never Lay 3rd Line From Bsl To Bd Being A Heavy Traffic Route And Too Much Load On Existing Double Line From Bhusawal To Wardha And From Wardha To Nagpur 3rd 4th Line Laying Work Is In Progress If Bsl Division Can't Lay 3rd Line From Bsl To Bd Route Then Atleast Ngp Division Can Lay 3rd line Till Badnera Jn To Reduce Some Load From Existing Double Line From Wardha To Badnera Please Reply Ngp Division Railfans
click here
please wait...Translate to English5 years ago, the Bhusawal (BSL) division sanctioned the work for the third line at the final location, but I think they will never actually lay the third line from Bhusawal to Badnera (BD) because it's a heavily congested route with too much traffic. There is already a lot of strain on the existing double line from Bhusawal to Wardha and from Wardha to Nagpur. The laying work for the third and fourth lines from Wardha to Nagpur is currently in progress. If the Bhusawal division can't lay the third line from Bhusawal to Badnera, then at least the Nagpur (NGP) division can lay the third line till Badnera Junction to alleviate some of the strain from the existing double line between Wardha and Badnera. Please reply, NGP division railfans. Check out the link for more information.
please wait...Translate to Hindi5 Sal Pahle BSL BD WR 3rd Line Final Location Work Sanction Ho Gaya Tha Par Mujhe Lagta Hai BSL Division Kabhi BSL Se BD Tak 3rd Line Nahi Banayegi Kyunki Ye Ek Heavy Traffic Route Hai Aur Bhusawal Se Wardha Tak Aur Wardha Se Nagpur Tak Existing Double Line Par Bahut Load Hai. Wardha Se Badnera Tak 3rd Aur 4th Line Laying Kaam Progress Mein Hai. Agar BSL Division BSL Se BD Tak 3rd Line Nahi Bana Sakti Hai Toh Kam Se Kam NGP Division Badnera Jn Tak 3rd Line Bana Sakti Hai Taki Wardha Se Badnera Tak Existing Double Line Par Kuch Load Kam Ho. Kripya Jawab Dein NGP Division Railfans