Statutory inspection of RE works followed by speed trial at full sectional speed(90 Kmph) in Birur-Masarahalli (40RKM/45TKM) single line section of Mysuru Division of SWR completed successfully. With this, total commissioning by CORE during 2022-23 is 1629.7RKM/2276.5TKM