The conditions of the coaches are so bad for all classes (even in 1st AC) that I have decided not to travel in this train until it gets LHB rake. Dont know why NWR is in sleep mode and not even thinking to upgrade the existing rake. This is the most premium train between Jodhpur to Mumbai and runs with good occupancy through out the year. Any one have idea when it will start running with LHB.