Amaravati needs to be run with 21 LHB rake now it's high time also the ICF rake is in bad condition i saw at VSG last month. Slip needs to go now.
They should utilise the rake of VSG NGT and restart VSG MAS via GTL RU and cancel the VSG TPTY link and run VSG HYB full rake and cancel the KCG VSG slip.