Spotted 37591 SRC WAP7 with COCR Special with SER rake at Pitline of Durg Junction.
The COCR Rake formation includes:-
Humsafar EOG
1st AC (21 made)
3rd...
more... AC (14 made)
Pantry Car
2nd AC
HA1 (19 Made)
HA1 (19 Made)
3 Sleeper Coach
Chair Card (21 Made)
Antyodaya second class
Second class
Chair Car
3Economy Coach
HCPV
SLRD (22 made)
3rd AC (19 made)
Yes the BSP - Durg section High speed COCR trial run was done. Soon to be upgrade to 130.
COCR is a High speed trial run for the section upgrade. The main aim is to upgrade the speed of train from 110 to 130 in section.
This is done with the help of LHB rake consists of 24 coaches which includes all coach like 1ac 2nd ac, 3ac, Pantry car, Sleeper coach, Gen coach with EOG.
Even if upgrades do occur, unless the punctuality of trains in JSG-BSP section increases, there won't be much advantage for trains coming from HWH side. Once this section used to witness flat 110 kmph runs but now it has completely changed into a freight section, with trains getting more than an hour behind schedule on a regular basis