As of now, SRR-MAQ section is 99% doubled, still a small portion b/w SRR-Karakkad is not commissioned
The reason behind this, they are not got the approval from safety inspection as bcoz of doubled line is more slope than the permissable.
Thats the reason still all the train under this section would run in single line and waiting the signal from Karakkad station.