Blog Entry# 5157819
Posted: Dec 08 2021 (21:15)
13 Responses
Last Response: Dec 09 2021 (21:20)
SER's 1st centralised monitering and signallling system trial being conducted at new Control Room Adra.
This system will give Real time Information of train movement in yard which will improve Frequency & Punctuality of train movement & also pass safety.
New EI cum Control Centre Adra to manage traffic in the following sections in the division in phased manner:
1. ADRA+JOC-BURN/MOH.
2....
more... ADRA+GRB-CNI.
3. GRB-JOC (mainline)
4. ANR-RUI (bypass line)
5. ADRA-MDN
6. ADRA-GMO via TLE.
click here
Yes reverting the old timing. New timing was disaster for Purulia Express.