many single line stretches betgara gumanihat and beyond new bongaigaon. track utilization in these sections about 170% so prior to doubling no new train or speeding rise possible. it is altogether different to run an one off oxygen train.
teesta, jaldhaka. saraighat bridge doubling and double line in naranarayan bridge quite a lot of work pending.