भागलपुर जंक्शन पुनर्विकास परियोजना
Rail Land Development Authority (RLDA) has recently issued LoA (Letter of Acceptance) to M/s. ARINEM Consultancy Services Pvt Ltd for providing Consultancy Services for Re-development of Bhagalpur Railway Station.
...
more... Contract Details:
Tender No.: RLDA/RFP/CT-105 of 2020
Name of the work: Consultancy Services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed Project Report (DPR) for Integrated Re-development of Bhagalpur Railway Stations of Malda Division (Eastern Railway).
Time for completion of work: 6.5 months
About the project:
This Railway Station is to be redeveloped using state of art technology for giving better passenger amenities, colony and maximize the revenue.RLDA has desired to select Consultant for Consultancy services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed Project Report (DPR) for Integrated Re-development of Bhagalpur Railway Stationen trusted to it by Ministry of Railways for Commercial Development with the objective of providing state of art passenger amenities and maximizing revenue.
Site Details:
Bhagalpur Railway Station is located in Malda Division of Eastern Railway.
Site Code: 02080501
Project Area: approx 7.5 Ha
Study Area: approx 5.5 Ha
Additional Details:
Work Plan: The consultant should propose and justify the main activities of the Assignment/job, their content and duration, phasing and interrelations, milestones (including interim approvals by the Employer), and delivery dates of the reports. The proposed work plan should be consistent with the technical approach and methodology, showing understanding of the TOR and ability to translate them into a feasible working plan.
Presentation: The consultant would be required to make a presentation on the approach & methodology, work plan, Tentative Design/Concept Plan (based on Historical & Cultural Heritage and modernity) and proposed team for performing the assignment as and when intimated by the Employer during the Evaluation Process.
Source :