1. Electrification has no relation to MPS of the route.
2. HJP-SPP-BJU/ HJP-MFP-BJU route is a flood prone region very close to the Ganga. The condition of the soil is not suited to faster speeds.
3. BJU-KIR is provided as slack timings, transitioning from ECR to NFR territory.