pls note that this is running via ngnt though there is no halt provided. if ots diverted via tel bza mainline 45 mins of Run time can be reduced further and this can be brought to coa soon after cocanada.
Right nw as per schedule - cock seshu gowtami circar s d sequnce whereas in reality most f d days seshu reaches ahead of cock. (today is an exception where seshu was overtook by cock at slo) :D.. seshu has abnormal slack. schedule of 3 hrs between slo and cct.
so...
more... if route of circar is changed the sequence would be seshu, cock, circar and gowtami.
The above along with extension to pdy (with late dep at ms) is very much feasible once 3rd pitline is operational and PM shifted to coa.