click hereCRS inspection and Electric Loco trial was completed for RE work between Bongaigaon-Rangiya section (108.53 RKM- 163 TKM) of NF Railway, on a difficult and challenging section. With RE of this section, NF Railway is going ahead to make RE up to Guwahati by Mar 2021.