Check your train!
It will be impossible to run this train.
1. Your train is overtaking trains like Geetanjali and Coromandel! These are giants on the route. Very few trains if any enjoy Coros' priority on the HWH-MAS route.
2. Impossible to go at an average from RNC to SBP at an average speed of 76 kmph. And give a halt at ROU. HWH-CSTM...
more... may skip ROU but your train cannot! Make RNC-ROU 55 kmph average speed and ROU-SBP can be kept at 70 kmph max
3. Give halts at Titlagarh/Rayagada. Duronto concept is over now, when the fastest duronto runs like a passenger between NDLS and BKN, you must provide at the very least reasonable halts.
4. Give slack before VZM, you are joining the HWH-MAS route at VZM.
5. VZM-BZA atleast 6 hours should be provided. RJY-kovur is a single track and more importantly VSKP-BZA track is oversaturated with trains and freights. Again donot compare your train with the HWH YPR Duronto, it is an expectionally prioritized train and it follows the entire HWH-MAS line upto GDR. Your train is joining from a different line.
6. BZA-GNT 45 minutes should be provided because of severe line congestation around BZA, KCC and TEN
7. Make GNT-GTL speeds reasonable at around 65-70 maximum, 80 km average is too big an ask on a single electrified tracks. Plus you will have congestion around DHNE, GY and GTL also. And halts needed at DHNE.
8. Halts needed at Ballari, Dharwad, Castle Rock.
9. And finally are you nuts bro! Check out the elevation changes, you need bankers here. Make your average speeds at a maximum of 35-40 kmph after Ballari bro. Your train cannot maintain an average of 67 here.
RED FLAGGED!