Overall Running time for Train No. 02203 in Vijayawada Division is as the following.
Bare Running Time - 04:07 Hours (12 Minutes for Vijayawada-Krishna Canal)
Engineering Allowance - 00:20 Hours (6 minutes, for every 100 KM's)
Traffic Allowance - 00:13 Hours
Halting...
more... Time - 00:15 Hours (at Vijayawada)
Grand Total - 04:55 Hours
For Train No. 02203, Running time between Visakhapatnam-Vijayawada North East Cabin is around 04:20 hours (Excluding 15 minutes halting time at BZA, and 20 minutes running time between Vijayawada North East Cabin-Krishna Canal)
There is difference of around 48 minutes, between running time of Train No. 02203 & 08561.
Such difference could be due to (8) stoppages for Train No. 08561, but Maximum permissible Speed for both train remains 110 KMPH only.