As expected on first day of revised TT not much change in it reaching Kannur. Reached almost 45 min before time.They have completely spoilt the running time between YPR-PGT.
• More than 30min stoppage at ED. I think MAS-MAQ mail would have overtaken.
• Even MAS-Allp superfast overtake has happened between CBE-PGT.
• And when 12257 (YPR-KCVL) Garib Rath resumes, it might also overtake this train...
more... even though it will depart 1 hr later from YPR.
So overall a disappointing TT full of slack to show good punctuality. Hope return time is not tampered with