PM can be shifted to Kcg for efficient usage of rakes. also RSA with Long distance trains which arrv in late mrng and dep in early evening such as Faluknama , Sabari can be established.
if idea of PM shifting to Kcg doesnt materialize, then extension to Krnt should be considered.