FIRST TIME IB SCHEDULE OF WAG9 LOCO DONE BY BURDWAN SHED WITHOUT ASSISTANCE OF ELS/HWH.
.
WAG 9 Loco No 32516 IB schedule done on 23.06.20 at BWN Shed. During schedule following repair noticed.
.
•CAB...
more... No 2 assistance side Horn continuous blowing.
•Panto No. 1 not lifted properly.
.
First time attention of this type of repair in a newly set up shed is not possible with out help of other Electric shed. But BWN Diesel Shed staff done this job successfully with out help of ELS/HWH. For this remarkable job CELE/ER announced Cash award Rs 5000/- for BWN Diesel .
.
Previously E.Loco of BWN was being attended by ELS/HWH