-- Check the route between Hosur and Yeshwanthpur. Trains can't come from BNC to SBC and move towards YPR. It should enter the Mysore Line and then LR should be done. So take it through Banaswadi.
-- Remove halts at Tumkur, Birur, and Harihara
-- Add halt at Davanagere