Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue May 28 19:16:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4568022
Posted: Feb 18 2020 (11:17)

No Responses Yet
Info Update
1468 views
0

Feb 18 2020 (11:17)  
Abhishek~
Abhishek~   28 blog posts
Entry# 4568022               Past Edits
The new business model for Indian Railways:
How does Private train model work?
In this model, the corporation takes all the decisions of running the service– fare, food, on-board facilities, housekeeping, complaints etc. Indian Railways is free from these encumbrances and gets to earn from IRCTC a pre-decided amount, being the owner of the network. This amount has three components- haulage, lease and custody.
IRCTC
...
more...
has to pay Indian Railways a sum total of these three charges, roughly Rs 14 lakh for the Lucknow Tejas runs in a day (up and down) and then factor in a profit over and above this. This money is payable even if the occupancy is below expectation and the train is not doing good business.
What powers does IRCTC have?
IRCTC insists that the coaches it gets from Railways are new and not in a run-down condition, as is seen in many trains. The quality of the coaches has a direct bearing on its business. In this model, IRCTC has full flexibility to decide the service parameters and even alter them without having to go to Railway ministry or its policies.
To that end, the business of running trains can be run with the independence needed to run a business with profit motive. This, policymakers believe creates the environment for enhanced service quality and user experience for the passengers.
IRCTC gets the freedom to decide even the number of stoppages it wants to afford on a route, depending on the needs of its business model. The Lucknow Tejas, for instance, has two stops, whereas the Mumbai-Ahmedabad Tejas has six stops. These stops are business decisions.
What is Indian Railways’ benefit from this model?
The bright side for Indian Railways is that it doesn’t have to suffer the losses associated with running these trains thanks to under-recovery of cost due to low fares and its own hefty overheads. The lease on its coaches is also taken care of.
Is this the same model for private train operators?
The model in which private train operators are sought to be engaged is different wherein along with haulage of Rs 668 per kilometer the operator needs to agree to revenue sharing with Railways. The company willing to share the highest percentage of revenue will win the contract. Private players may not need to pay lease and custody charges as it is expected that they will bring in their own rolling stock.
All this is because over the next five years, after the two dedicated freight corridors are operationalised and a lion’s share of freight trains move to the corridors, a lot of capacity will free up in the conventional railway lines for more passenger trains to run to cater to the demand. The government wants private players and maybe also its own PSU, along with Indian Railways, to share the load of pumping in more trains into the system.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 391HBR~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy