Eagerly awaiting to join the BG network, clean and tip top mailani junction ready with crs trials of lakhimpur- mailani section.
Three BG platforms(one high level and two medium level) ready with drinking water, high drain pipes and FOB apart from the two existing low level MG platforms
Mailani-pilibhit section GC work going on in full swing as laying of tracks on the set sleepers going on. L&T has been given that contract.