For your kind information and eye opening IR does a lot of mistakes in introduction of train routes, config, timings, days of run which conducting proper traffic feasibility survey and introduce as per political pressure. At least now they have corrected on public demand after 4 yrs of introduction. Most Humsufur express are good examples where are introduced in routes where are no daily trains and running with 6 AC coaches.