By the time HPT - UBL section gets electrified KJM would have get sufficient WAP-7s so there wont be difficult to arrange locos as SBC will sends loco to a MYS bound train as carrier and that would be the link for Hampi as 75%of its route is under wires so both SWR and SCR dont want trains to run with Diesel loco in SBC GTL section so even they may provide LC for Hampi at BAY when KLU GTL re gets commissioned