Entering in to loop for a halt at mandavalli mainlines and up loop
The new track is on the right side (while travelling towards BVRT). Hence trains towards Gudivada use this line. How is it that 17256 is using this line while travelling towards Bhimavaram?
I was jst saying that moving on to double track not on new track