What I think is presently Doubling is very important than RE of this section. RE can be done later also with not much time.. Tenders of OHE poles will not be floated separately it will be floated including Tender which is Floated for 25KV Electrification with TSS at of Gadag excl - Hotgi excl section.. All purchasing will come in the same tender..