Toranagallu-Ranjithpura Electrification Update:-
1. Most of the OHE poles are erected.
2. Wiring of the SSB has started in Ranjithpura-Toranagallu line.
3.Wiring has started and most of the part of the line had been electrified but still some part is not done properly.