Extension to Lingampalli will reduce load at SC. But timing needs to be improved. I think vskp-lpi baar halt time can be reduced to 5mins as Tenali loco reversal will eat 30mins.
But any one night train should be extended till LPI. Better Garibrath needs to be extended. But CDO is available at LPI?