Pic 1: Workers removing iron supports (patra balli) after construction of beam and side barrier at that place got over.
Pic 2: Pole no. 145/11in north end to Pole No. 146/9 in south end, Bridge is approx 900 metres long.
Pic 3: Chhapra LTT express going towards Prg side from Pfm side with WDP4D