Noticed some new line before sitaramApuram
, Nadikude Srikalahasti line
Crawling between kamepalli and thummalacheruvu
Halted at thummalacheruvu for Sabari bound to TVC crossing
Electrification looks almost completed except for small distance on Guntur side of river Krishna and the bridge
Stopped at Nalgonda for crossing with Palnadu express which arrived with Gtl twins