Yes. Daily up down trials are taking place. The 24 coaches rake which is being used for 130 trials have minimum one of each type i.e LHB CC/EC/2S/SL/1A/2A/3A/1A cum 2A/PC/EOG. SRC WAP 7i is being used for the trials. Sand bags are present in all the coaches. As SER don't have any HA yet ER gave one HA to SER for the trials. Few crossovers needs to be made 130 capable otherwise everything is on its way and we will soon see CSMT/PUNE Durontos, Steel, Jnaneswari doing 130 in the said section.