As we all know A new Mumbai Rajdhani will be introduced via Central Railways namely 22221/22222 Mumbai CSMT-H.Nizamuddin Rajdhani Express which has a longer time duration as expected. Which of the following is required to work on to reduce the time and increase the speed.