Thank you buddy, even in my recent visit i observed one thing. The current Ubl line which serves now, will become down line and doubling line coming from Ubl side is getting merged with existing single BG line meant for Bjp trains. Other than this another ground work for third line that will be mostly for train coming from Bjp side is getting constructed left side while entering Gdg, somebody can clarify on this. Total we can assume 3 lines(including the constructing line) as of now.