FIRST LHB RUN OF BAIDYANATH DHAM EXP
Another day, another LHBfication
Patna Puri Baidhyanath Dham exp gets a change over from it's old ICF rake to new LHB rake. All the 3ac coaches and 3 of the 4 general coaches were 18 made, the 2ac coach and the last General coach were 17 made whereas all the Sleepers were old 12...
more... made coach with a blackish tint.
Pic 9 to 15 - captured by Dip @Adra
#SC17