Finally the D day has come when NER has taken mega block to link tracks at STP/Sitapur. 20 hours of 2 day long mega block been taken (10 hour's each day) where new track (coming from ASH/Aishbagh) will be linked to existing track (coming from BUW/Burhwal). Post mega block which is part of ASH-STP GC any train coming from LJN-ASH-LC-DAL can go to SPN-MB via STP/SCC along with MLN-PBE route and any train coming from GKP-GD-BUW can also go to MLN-PBE route along with SPN-MB route and vice versa. Now STP/Sitapur will have 5 BG line. Have a look of small glimpse of mega block.