this train ran with 21 coaches including 1 DX & 1 CX on 28th march 2012, which made her the longest Jan Satabdi on IR. But at the same time it is seen that almost half of seats remain vacant most of the time. So why this train is running with such large number of coaches? I think the number of coaches of this train should be reduced- at least 6 coaches should be reduced. with those coaches one new JS should be started between BPL-NDLS or BCT-ADI.